Agriculture Water Infrastructure

AWP: Stream 2 Closed

Agriculture Water Infrastructure Stream 2 – Community Project is not accepting applications. Please sign up to the newsletter to learn about future applications.

Through this program, the Government of BC seeks to see improvements to stream flows, fish populations and an increased and more sustainable food production.

Sign up for AWP Updates

Please send me:

Stream 2 Overview


Stream 2 focuses on community projects that have a strong commitment to agriculture, including those that try to expand current water systems to serve additional irrigated lands. This helps support community-owned water infrastructure that brings long-term services and benefits to multiple agricultural water users to increase food production.

Successful applicants of Stream 2: Community Projects will receive cost-shared funding to improve water use efficiency, water security, water availability or drainage conditions for agricultural communities.

Approach


Within Stream 2: Community Projects, there are nine eligible activities:

  1. Rehabilitation and upgrades of (regulated and unregulated) agricultural dams and reservoirs to meet regulatory requirements.
  2. Improvement, expansion or new construction of dugouts and related storage infrastructure for irrigation water and livestock watering including rangeland.
  3. New construction of other water storage infrastructure.
  4. Improvement, expansion or new construction of off-farm conversion of conveyance ditches to pipelines where savings of 30 to 50% can be achieved.
  5. Improvement, expansion or new construction of water delivery systems to the farm gate from off-farm infrastructure and licensed intakes on streams.
  6. Extension of an existing water purveyor network to expand water supply to additional agricultural lands.
  7. Development of new water purveyed systems to agricultural land.
  8. Installation of meters where a universal agricultural water metering program is being implemented by a water purveyor.
  9. Improvement or expansion of diking and drainage systems.

More information about Stream 2 Activities is available below.

Minimum Funding AmountMaximum Funding AmountCost-Shared Ratio
No minimum$2,000,000*50%

Stacking of funds from other government programs is allowed up to 100% of project costs provided the programs are not delivered by IAF.

Eligibility Criteria


To be considered eligible for Stream 2, applicants must be BC-based and must be one of the following:

  • Irrigation District or Improvement District
  • Local Government or Regional District
  • Non-Profit Organization – Agriculture
  • Non-Profit Organization – Conservation
  • Water Users’ Community
  • Indigenous Community
  • Indigenous Governing Body
  • Indigenous Organization – For-Profit
  • Indigenous Organization – Non-Profit

Community water supply groups, including Indigenous groups, that provide a combination of irrigation/drainage/diking services to a mix of agricultural and non-agricultural water users are eligible, unless specified as ineligible under the activity description.

Public corporate bodies incorporated or formed under specific provincial legislations which allow them to legally acquire/hold/control property and licences and conduct works are also eligible.

The following applicants are not eligible to participate in this stream:

  • Diking District
  • Producer – Cooperative
  • Producer – Corporation
  • Producer – Limited Liability Company (LLC)
  • Producer – Partnership
  • Producer – Sole proprietorship
  • Indigenous Producer – Limited Liability Company (LLC)
  • Indigenous Producer – Partnership
  • Indigenous Producer – Sole Proprietorship
  • Indigenous Cooperative
  • Indigenous Corporation
  • Non-agricultural individuals or groups (including Seafood/Aquaculture)
  • Provincial and federal governments
  • Crown Corporations

Activities


There are nine activities within Stream 2 of the Agriculture Water Infrastructure Program. The eligible costs, requirements and details are available below. Activities include:

  • ACTIVITY 1: Rehabilitation and upgrades of (regulated and unregulated) agricultural dams and reservoirs
  • ACTIVITY 2: Improvement, expansion or new construction of dugouts and related storage infrastructure
  • ACTIVITY 3: New construction of other water storage infrastructure
  • ACTIVITY 4: Improvement, expansion or new construction of off-farm conversion of conveyance ditches to pipelines
  • ACTIVITY 5: Improvement, expansion or new construction of water delivery systems to the farm gate
  • ACTIVITY 6: Extension of an existing water purveyor network
  • ACTIVITY 7: Development of new water purveyed systems to agricultural land
  • ACTIVITY 8: Installation of meters by a water purveyor
  • ACTIVITY 9: Improvement or expansion of diking and drainage systems

In addition to the requirements for the individual activities listed below, applicants to Agriculture Water Infrastructure Program – Stream 2: Community Projects must also:

  • Have completed any required assessments, engineering studies or plans (within or outside of the program) prior to applying for funding.
  • Meet all technical, environmental, and regulatory standards and/or requirements, as applicable
    • g., a water licence has been issued/amended; documentation from the Ministry of Water, Land and Resource Stewardship confirming the proposed work is mandatory or recommended, and an authorization has been provided by the Dam Safety Program for the alternation, improvement, or replacement of a dam; approval from Agricultural Land Commission (ALC).
    • If permits are pending/under review but the application is otherwise complete, please refer to Review and Adjudication below for guidance.

Stream 2 Activity Details

Rehabilitation and upgrades of (regulated and unregulated) agricultural dams and reservoirs to meet regulatory requirements.

One of the primary methods to alleviate both spring flooding and summer drought is the construction or enhancement of water storage systems. A well-designed storage system can capture a portion of the peak spring flow for use later in the summer when demand is highest.

Water storage infrastructure will be eligible where there is an indication the water supply is currently unable to meet agricultural demand, where it is unlikely to meet demand under future climate change conditions, and where upgrades are required for existing infrastructure that are failing.

  • Dams with deficiencies where the dam owner have not been ordered to make repairs or lower the reservoir. Deficiencies are most often identified by the owners’ consultant. They will often provide recommendations on how to remediate the dams. In these cases the Dam Safety Program works with the dam owner on a plan to remediate without issuing an order.
  • An assessment by the Dam Safety Program staff would be legally required before the work begins and when upgrade is completed.
  • Increasing the size of the storage will require an authorization from the Ministry of Water, Land and Resource Stewardship.
  • Construction, materials, machinery/equipment (gates, valves, etc.) and other costs associated with the construction.
  • Pumping systems and watering troughs to keep livestock out of the existing reservoir are recommended and are eligible costs, provided the reservoir is deemed to provide a secure source in periods of extended drought. Fencing if installed along with a pumping system is recommended and an eligible cost to keep cattle out of the reservoir.
  • Other professional services associated with the project supervision
  • Water distribution system
  • Used materials
  • Water licence for the proposed use (e.g., irrigation) of the water source (i.e., aquifer, stream)
  • Water licence for the proposed storage volume
  • Assessment/approval/authorization from the Dam Safety Program staff of the Ministry of Water, Land and Resource Stewardship
  • Change approval to make changes in and about a stream (if applicable)
  • Easement (if appliable)
  • Engineering assessment, plan or other consultative services conducted by Qualified Professionals as required by the Dam Safety Program of the Ministry of Water, Land and Resource Stewardship (as described in Stream 3 Activity 3 to 6). The plan, as applicable, should include the items listed under eligible costs within this activity.

Improvement, expansion or new construction of dugouts and related storage infrastructure for irrigation water and livestock watering including rangeland.

  • Producers on low flow water supplies will often install a dugout to enhance supply by augmenting water supplies during times of shortage.
  • Lining of dugouts to improve water holding capacity.
  • Installation of pumps and watering troughs to improve livestock watering and protect stream health.
  • Construction, materials, liner, pump, intake, machinery/equipment (e.g., gates, valves, etc.) and associated fittings and controls
  • Power supply to farm property line as required
  • Solar or wind power supply for remote livestock watering systems
  • Planting of trees and snow fencing to facilitate snow collection and melt
  • Dugout aeration systems (wind or electric compressors)
  • Pumping systems and watering troughs to keep livestock out of the existing dugout are recommended and are eligible costs, provided the dugout is deemed to provide a secure source in periods of extended drought. Fencing if installed along with a pumping system is recommended and eligible cost to keep cattle out of the dugout.
  • Other professional services associated with the project supervision
  • Water distribution system
  • Used materials
  • Dugouts with design specifications that are legally considered as dams according to the Dam Safety Regulation (DSR)
  • Water licence for the proposed use (e.g., irrigation) of the water source (i.e., aquifer, stream)
  • Water licence for the proposed storage volume
  • Change approval to make changes in and about a stream (if applicable)
  • Easement (if appliable)

Note: To determine if a water licence is required for a dugout, please refer to Authorization Requirements for Storage and Use of Water in Dugouts.

Please refer to Authorization Requirements for Storage and Use of Water in Dugouts, Guidance on Farm Water Storage, B.C. Agriculture Water Calculator, and B.C. Farm Water Dugouts, or contact the Dam Safety Program staff.

For dugouts and other water storage infrastructure with design specifications that are legally not considered as dams according to the Dam Safety Regulation (DSR): engineering design plan, prepared by a Qualified Professional, that includes, but is not limited to, farm water use requirement, water supply sources and volume, peak flow rate, dugout dimensions (depth, length and width) with berms, regulatory requirements, and the items listed under eligible costs within this activity.

  • New storage infrastructure will require an authorization from the Ministry of Water, Land and Resource Stewardship.
  • Water use will need to be licensed for each purpose.
  • New storage infrastructure will require an engineering plan.
  • Construction, materials, machinery/equipment (gates, valves, etc.) and other costs associated with the construction.
  • Pumping systems and watering troughs to keep livestock out of the existing reservoir are recommended and are eligible costs, provided the reservoir is deemed to provide a secure source in periods of extended drought. Fencing if installed along with a pumping system is recommended and eligible cost to keep cattle out of the reservoir.
  • Other professional services associated with the project supervision.
  • Water distribution system
  • Used materials
  • Water licence for the proposed use (e.g., irrigation) of the water source (i.e., aquifer, stream)
  • Water licence for the proposed storage volume
  • Assessment/approval/authorization from the Dam Safety Program staff of the Ministry of Water, Land and Resource Stewardship
  • Change approval to make changes in and about a stream (if applicable)
  • Easement (if appliable)

Please refer to Authorization Requirements for Storage and Use of Water in Dugouts, Guidance on Farm Water Storage, B.C. Agriculture Water Calculator, and B.C. Farm Water Dugouts, or contact the Dam Safety Program staff.

For water storage infrastructure with design specifications that are legally considered as dams according to the Dam Safety Regulation (DSR): engineering assessment, plan or other consultative services conducted by Qualified Professionals as required by the Dam Safety Program of the Ministry of Water, Land and Resource Stewardship (as described in Stream 3 Activity 3 to 6). The plan, as applicable, should include the items listed under eligible costs within this activity.

For water storage infrastructure with design specifications that are legally not considered as dams according to the Dam Safety Regulation (DSR): engineering assessment or plan conducted by Qualified Professionals. The assessment and plan should include, but is not limited to, farm water use requirement, water supply sources and volume, peak flow rate, infrastructure dimensions, regulatory requirements, and the items listed under eligible costs within this activity.

Improvement, expansion or new construction of off-farm conversion of conveyance ditches to pipelines where savings of 30 to 50% can be achieved.

Water demand will increase with climate change but adding water storage to supplement demand is not always an option. In these cases, the best way to maintain or increase production in water-scarce areas is by using existing water supplies more efficiently to maximize diminishing water supplies and help protect crops from increasingly frequent weather extremes. New delivery systems could also be built to provide better access to water in areas with sufficient supply. In these cases, anticipated warmer and longer growing seasons could lead to an increase in agricultural production with the funding of additional irrigation infrastructure.

Pipelines reduce conveyance losses and can also provide water to the farm under pressure, thus reducing pumping requirements.

  • Materials and construction costs for source development (e.g., surface storage and intake)
  • Mainline distribution system including materials and construction costs (trenching, augering under roads, canals or watercourses)
  • Electric power line extension if required for an existing diesel pump or a new pump installation/upgrade to allow water to be brought from the off-farm water supply source to the farm property line. This may include upgrading from a single-phase to a three-phase connection if the pump upgrade requires three-phase.
  • Other professional services associated with the project supervision
  • Membership/share cost for tie-in to an existing pipeline
  • Troughs, tanks, hydrants in the yard, livestock pens or barns
  • On-farm water distribution systems
  • Backflood irrigation works
  • Used materials
  • Water licence for the proposed use (e.g., irrigation) of the water source (i.e., aquifer, stream)
  • Water licence for the proposed storage volume (if applicable)
  • Change approval to make changes in and about a stream (if applicable)
  • Easement (if appliable)

Engineering study or design plan by Qualified Professionals to identify technical and construction requirements, e.g., survey of ditch length to be replaced by pipe, diameter of pipeline, location of pumphouse, locations of current and potential service connections, flow measuring devices, river/stream crossings, oil/gas/fibre optics pipeline crossings, and items listed under eligible costs within this activity.

Improvement, expansion or new construction of water delivery systems to the farm gate from off-farm storage infrastructure and licensed intakes on streams – including the expansion of water distribution systems.

  • Materials and construction costs for source development (e.g., surface storage and intake)
  • Mainline distribution system including materials and construction costs (trenching, augering under roads, canals, watercourses)
  • Electric power line extension if required for an existing diesel pump or a new pump installation/upgrade to allow water to be brought from the off-farm water supply source to the farm property line. This may include upgrading from a single-phase to a three-phase connection if the pump upgrade requires three-phase.
  • Other professional services associated with the project supervision
  • Membership/share cost for tie-in to an existing pipeline
  • Troughs, tanks, hydrants in the yard, livestock pens or barns
  • On-farm water distribution systems
  • Backflood irrigation works
  • Used materials
  • Water licence for the proposed use (e.g., irrigation) of the water source (i.e., aquifer, stream)
  • Water licence for the proposed storage volume
  • Change approval to make changes in and about a stream (if applicable)
  • Easement (if appliable)

Engineering study or design plan by Qualified Professionals to identify technical and construction requirements, e.g., diameter and length of pipeline, location of pumphouse, locations of current and proposed service connections, flow measuring devices, river/stream crossings, oil/gas/fibre optics pipeline crossings, and the items listed under eligible costs within this activity.

Extension of an existing water purveyor network to expand water supply to additional agricultural lands.

  • Mainline distribution system including materials and construction costs (trenching, augering under roads, canals or watercourses)
  • Electric power line extension if required for an existing diesel pump or a new pump installation/upgrade to allow water to be brought from the off-farm water supply source to the farm property line. This may include upgrading from a single-phase to a three-phase connection if the pump upgrade requires three-phase.
  • Other professional services associated with the project supervision
  • Membership/share cost for tie-in to an existing pipeline
  • Troughs, tanks, hydrants in the yard, livestock pens or barns
  • On-farm water distribution systems
  • Used materials
  • Water licence for the proposed use (e.g., irrigation) of the water source (i.e., aquifer, stream)
  • Water licence for the proposed storage volume
  • Change approval to make changes in and about a stream (if applicable)
  • Easement (if appliable)
  • Approval for purveyed boundary changes

  • Materials and construction costs for source development (e.g., surface storage and intake)
  • Mainline distribution system including materials and construction costs (trenching, augering under roads, canals or watercourses)
  • Electric power line extension to the off-farm water supply as required to allow water to be brought to the farm property line
  • Other professional services associated with the project supervision
  • Membership/share cost for tie-in to an existing pipeline
  • Troughs, tanks, hydrants in the yard, livestock pens or barns
  • On-farm water distribution systems
  • Backflood irrigation works
  • Used materials
  • Water licence for the proposed use (e.g., irrigation) of the water source (i.e., aquifer, stream)
  • Water licence for the proposed storage volume
  • Change approval to make changes in and about a stream (if applicable)
  • Easement (if appliable)
  • Documentation of current purveyed boundaries and approval for any boundary changes

Installation of meters where a universal agricultural water metering program is being implemented by a water purveyor.

  • Purchase and installation costs of meters for agricultural users
  • Other associated parts and materials (e.g., pipes, valves, etc.)
  • Other professional services associated with the project supervision
  • Meters for non-agricultural users
  • Used meters, parts and materials
  • Easement (if appliable)
  • Documentation of current purveyed boundaries and approval for any boundary changes

  • Funding under Stream 2 Activity 9 is intended to protect agricultural land from flooding using effective diking and drainage infrastructure resulting in improved food production in areas subjected to excess water.
  • Please indicate if the existing infrastructure has been damaged from a recent disaster.
  • The applicant must have the authority and ownership to develop, implement, maintain, and operate the proposed project, as well as plans and budget for its operations and maintenance of the proposed infrastructure. The applicant will need to maintain ongoing operations and retain title to and ownership of the infrastructure in perpetuity. An exception may be made to transfer ownership to another local government.
  • Where the applicant is not the owner of the infrastructure and associated assets, the project may proceed if ownership of the infrastructure and associated assets is transferred to the applicant before the project is completed. For example, an applicant may apply for infrastructure owned by an improvement or diking district, water utility, or private water systems, if the ownership of the infrastructure and associated assets is transferred to the sponsoring local government.
  • The infrastructure should take into consideration flood hazards as well as current and potential future impacts of climate change in the community. The proposed project should help mitigate risks from future disasters due to natural hazards and climate-related risks. While raising the dikes, constructing new dikes, or conducting other related works, the proposed work should not compromise the safety of other dikes or increase the risk of flooding to others or to the environment, e.g., transfer of flood risk downstream, destruction of fish habitat, introduction of pollutants to the environment.
  • The proposed works should be planned and scheduled to ensure that flood protection is not diminished during potential flood periods, and temporary measures shall be provided, as necessary, during construction to ensure that the dike functions as designed. The proposed works should be planned and constructed to also meet environmental needs.
  • Materials and construction costs for a comprehensive flood control system, which may include, but is not limited to, culverts, pipes, flood boxes, utility lines, pump stations, and pump discharge line.
  • Electric power line extension if required to allow water to be removed from farmland within the floodplain. This may include upgrading from a single-phase to a three-phase connection if the pump upgrade requires three-phase.
  • Other professional services associated with the project supervision, e.g., according to the Dike Maintenance Act Approvals
  • Dike/drainage infrastructure to support non-agricultural activities, e.g., recent or future non-agricultural developments, in known flood hazard areas.
  • Construction of evacuation roads or structures.
  • Routine or ongoing operations and maintenance, including regular responsibilities for stormwater systems management.
  • Flood mitigation projects that yield only temporary measures, e.g., use of sandbags or log jam removal.
  • Debris or sediment removal, including clean out of debris control structures (other than when a mandatory phase of a permanent solution).
  • On-farm water distribution or collection systems.
  • Used materials.

Diking districts and improvement districts are ineligible for funding under Stream 2 Activity 9 for diking infrastructure improvement or expansion to align with provincial policy direction of dike safety management pertaining to the construction of dikes. Please refer to the Diking Authorities for New Dikes Policy for details. This applies only to diking infrastructure projects proposed by diking districts or improvement districts under Stream 2 Activity 9.

Engineering study or design plan by Qualified Professionals to identify technical and construction requirements, e.g., location and upgrade/replacement of culverts, pipes, flood boxes, utility lines, pump stations and items listed under eligible costs within this activity.

The following projects and activities are not eligible for funding or reimbursement in this stream:

  • Activities or costs incurred prior to approval (no retroactive approval permitted)
  • In-kind activities
  • Activities to support non-agricultural water uses
  • Activities not directly related to agricultural water uses
  • Purchase of farm equipment and related accessories or attachments (including tractors, skid steers and trailers)
  • Activities that are not compliant with federal, provincial or local/municipal regulations
  • Financial compensation for lost income, production or land or other associated losses due to water shortages, government orders, or other reasons
  • Activities to remove land from the Agricultural Land Reserve (ALR)
  • Purchase of land or easement
  • Regular or on-going operating or maintenance activities
  • Training or educational courses
  • Financing charges, loan interest payments, bank fees and related charges
  • Activities currently receiving funding from other funding sources
  • GST and other taxes/credits reimbursed to applicant
  • Wells
  • Water quality treatment
  • Irrigation systems (new or existing) funded under Beneficial Management Practices program (BMP 1804)

Applying to the Program


Applicants to the Agriculture Water Infrastructure Program – Stream 2 can submit an Expression of Interest (EOI) through the IAF Client Portal starting on July 3, 2024. EOIs will be accepted until July 24, 2024, at 4 pm.

Following EOI review, only those with successful EOIs will be invited to apply. See Review and Adjudication below for more information.

Notification of application closure will be provided in the Agriculture Water Newsletter and posted to this webpage.

Applications will be assessed by Ministry of Agriculture and Food staff to ensure viability, reasonableness, and eligibility.

IAF will send out full applications to those with successful EOIs.

Projects have 5 years from approval to complete or by January 15, 2032, whichever is first. Projects may carry over between fiscal years.

IAF staff are available to answer questions regarding eligible activities, costs and/or the EOI process. IAF may also contact applicants for additional information or clarification to assess their EOI.

Applicants can contact awp@iafbc.ca with any questions about the program or to receive support in developing their EOI.

Important Program Dates

July 3, 2024
EOIs Open

July 3, 2024
July 24, 2024 at 4pm
EOIs Close

July 24, 2024 at 4pm
by September 17, 2024
Invitations to Apply

by September 17, 2024
October 17, 2024 at 4pm
Application Deadline

October 17, 2024 at 4pm
Upon approval
Project Start

Upon approval
By January 15, 2032 or within 5 years
Project Completion

By January 15, 2032 or within 5 years

Accessing the IAF Client Portal

To apply to the program, you must first create an IAF Client Portal account and register your organization by navigating to the IAF Client Portal and selecting “Create an account now.

If you have previously applied to an IAF-delivered program you can skip this step – you’re already registered!

Sign Up & Register

Step 1 – New Account

Visit the IAF Client Portal and click ‘Create a New Account’. If you already have an account you’re all set! Skip to the Apply section below.

Step 2 – Confirm Province

As you are a BC-based operation, confirm you are authorize to operate in BC by responding ‘Yes’ to the first question. As you are not a student applying to the Summer Student Farm Worker Bursary answer ‘No’ to the second question.

Step 3 – Personal Contact Details

Provide your name, job title, phone number and email address. This is also the opportunity to confirm you are the signatory for your organization (i.e. you have the right to sign a legal contract on behalf of your organization).
If you are not the signatory for your organization that’s no problem, please respond no. You can still start an application on behalf of the organization, but will need to confirm the signatory in the future.

Step 4 – Organization Details

Provide your name, job title, phone number and email address. This is also the opportunity to confirm you are the signatory for your organization (i.e. you have the right to sign a legal contract on behalf of your organization). If you are not the signatory for your organization that’s no problem, please respond no. You can still start an application on behalf of the organization, but will need to confirm the signatory in the future.

Provide the information about the organization you are apply on behalf of. This includes the following:
– Legal Organization Name (either Federal or BC)
– Operating Name (if different from legal)
– Organization Type (select from set options)
– Organization Address, Email, Phone number and website
– Organization Registration Date (either Federal or BC)
– Head Office Location
– BC Registration ID (to look up your BC ID click here)
– CRA Business Number
– NAICS Code 6-digit (select from set options – click here for guide)
– Primary Purpose of Operation (select from set options)
– Sector Group (select from set options)
– Region (select from set options)

CLICK SUBMIT

Step 5 – Validation

The IAF Team will now review the information you provide and validate your organization. It can take up to two business days to validate your organization. If you haven’t received an email in 3 – 5 business days check your spam folder, then contact IAF at info@iafbc.ca

Starting your AWP Application

If you’re reading this information prior to application submissions opening, you can start (i.e. draft, edit & view) your application. This takes the pressure off for first-come, first-served programs – allowing you to work on your application without the pressure of submission.

To find the application navigate to the ‘Opportunities‘ tab in the IAF Client Portal and select AWP Stream 2.

Step 1 – Additional Organization Details

Select the Organization applying for the program (if you have more than one). This program requires a few additional details about your organization that wasn’t collected when you registered.

For NTT this includes:
– Primary and Secondary Contact Information
– Applicant Type (examples: Producer, Local Government, Indigenous Community, etc.)

This is also an opportunity to confirm the following are accurate:
– CRA Business Number
– Organization Type
– Sector Group
– Primary Purpose
– Organization Registration Date

Step 2 – Project Details

Outline what you have planned for your project. Please only apply to activities you are confident you will be able to complete on-time and on-budget.

In this section you will also provide:
– Project start date and end date (desired)
– Project Name
– Project Summary
– Select activities you intend to complete
– Demonstrate how all technical, environmental, regulatory standards and/or requirements (as applicable) are met.
– Water problems/issues to be solved and how the project will address them.
– Project location (latitude and longitude)
– Performance measurement information

We recommend clicking ‘Save’ frequently as you work on your application in case of an unexpected disconnection.

Step 3 – Project Budget

Provide a break down of your project costs into the activities as outlined. If your proposed project has multiple components that would fit under two or more activities, please include a budget summary in your project documents that specifies what quoted costs reflect your selected activities.

Step 4 – Terms & Conditions

Review and agree to the terms and conditions.

Step 5 – Upload Documents

Upload any invoices or supporting documents. This includes assessments, quotes, equipment specifications, blueprints and more.

If you are a corporation or partnership, please also include a copy of your Corporate Registry (this is how we verify you are eligible to apply on behalf of your organizations).

Step 6 – Save & Submit

To submit an application: Click ‘Save and Close’ when you are finished editing your application to review. Click Edit to make adjustments.

To submit, click the ‘Submit’ from the review screen. Reminder: the ‘Submit’ button will only appear if applications are being accepted.

Need help with IAF’s Client Portal?

We’ve created a number of tutorials and FAQs about the IAF Client Portal to help you navigate this resource successfully.

Review and Adjudication


Upon receipt of a submitted EOI, expressions of interest are screened by the IAF Team. This review entails:

  • Organization / applicant eligibility check.
  • Initial review of application completeness including required permits/documents for each project activity.
  • Project / budget eligibility check.
  • Confirmation of alignment with program eligibility.
  • Evaluation against the AWP Stream 2 Expression of Interest Evaluation Criteria. Evaluation criteria will be available online at bciaf.ca/awp prior to EOI submissions.

EOIs will also be shared with Ministry of Agriculture and Food staff for input.

IAF anticipates having the EOI results by September 30, 2024, and will act in a timely manner to provide EOI decisions. Only those EOIs that meet the evaluation criteria threshold will be invited to complete a full application. Applicants will be notified by email of Expression of Interest results via the IAF Client Portal. EOIs that are not successful will not be brought forward for any future application intakes. Should another intake occur, applicants will need to re-apply for future consideration. Should an invitation to apply be extended, applicants will have 30 days to complete the application.

Upon receipt of a submitted application, projects are screened by the IAF Team. This review entails:

  • Organization / applicant eligibility check.
  • Initial review of application completeness including required permits/documents for each project activity.
  • Detailed project / budget eligibility check.
  • Confirmation of alignment with program eligibility.

If permits are pending/under review but the application is otherwise complete, IAF will proceed to review the application. However, any approval will be conditional until all required documentation is received. Conditional offers/approvals will not receive contracts or be able to incur expenses and/or begin activities in their application until their project has met the conditions of approval.

Upon successful completion of the initial review, projects will be sent to a Technical Review Committee for secondary review and endorsement. This review entails:

  • Secondary review of application completeness and confirm project meets all technical, environmental, regulatory standards and/or requirements (as applicable)
  • Technical review of project / budget including but not limited to
    • Sufficiency of resources/capacity to achieve in timeframe permitted.
    • Project management and technical/human resources.
    • Highlight technical/permitting considerations needing further review or approval (if applicable).
  • Evaluation based on criteria set by the Ministry of Agriculture and Food.
    • Criteria will be posted to www.iafbc.ca/awp prior to invitations for full application being sent.

During the Application Review, if the IAF or Technical Review Committee determines a further technical review is required for the project, then the entire project, or specific components of a project, may undergo additional review. This review is performed by a technical expert/specialist with expertise in the field most applicable to the project in question.  The intent of the review is to:

  • Clarify, confirm, or provide feedback on the proposed activities, methodology or budget item(s) that may be in question.
  • Address technical, legal, or permitting questions.
  • Validate claims of sector benefit.
  • Confirm/clarify prioritization (if applicable).

Once identified, members of the IAF Team may work in consultation with funding partners to confirm the need for additional review and identify an appropriate specialist to conduct the review.

IAF will work to provide funding decisions within 10-12 weeks of receipt of the completed application submission. Please note, IAF will act in a timely manner to provide funding decisions but cannot determine how long the Technical Review Committee or subsequent technical reviews will take to complete.

Applicants will be notified by email of funding decisions via the IAF Client Portal. Applications that are not successful will not be brought forward for any future application intakes. Should another intake occur, applicants will need to re-apply for future consideration. Upon request, applicants who are not successful in their funding application will be provided information on areas where future application could be strengthened based on their evaluation and any considerations/suggestions noted in review. All adjudication decisions are final. Application can view the status of their application on the IAF Client Portal at any time.

Have a question?

If you have any questions about your Expression of Interest, program eligibility, required documents, etc., IAF encourages you to reach out to awp@iafbc.ca or call 250-940-6150.

Information Session

IAF hosted a webinar about Stream 2 on July 10th, 2024. Watch it below or find all the AWP webinars on IAF’s YouTube channel.

Notifications & Obligations


Funding Notifications & Contracts

If the project is approved, IAF will inform the applicant of the details of the decision and any associated terms and conditions via email. The applicant then enters into an agreement with IAF which outlines the obligations of each party.

Funding is application and project-specific and must be used for the approved project and related expenses. Funds are non-transferable.

Project activities requiring financial resources cannot commence until the contribution agreement has been signed by both the applicant and IAF.

Projects receiving funding through Stream 2: Community Projects of the Agriculture Water Infrastructure Program can begin as of approval and must be completed within five-years or by January 15, 2032, whichever is first. Projects may carry over between fiscal years.

Funding limits are set per stream per project. Applicants can apply to multiple streams; however, they will need to apply for each stream separately and can only have a single Agriculture Water Infrastructure Program (2024-2032) project underway at once. There is no lifetime maximum funding limit per applicant.

If the project is not approved, the applicant will receive a written response from IAF via email and via the IAF Client Portal.

Changes to Contracted Projects

If you are not able to complete your project according to the approved workplan, please inform the IAF Team as soon as possible using the IAF Client Portal.

Funding Details

An initial payment (up to 50%) may be made by IAF upon signing of a contribution agreement or submission of the first progress report, however IAF may reduce this advance based on project/applicant risk. Interim and final payments will not be initiated by IAF until reporting requirements are satisfactorily met by the client. These requirements may include one or more progress reports or a single final report at the end of a project, based on the amount of funding approved, length of project, and project complexity/risk.

Interim and final payments will be made based on actual expenses reported and payments will be made in arrears. All projects will require a final report and a minimum of 20% of approved funding will be retained by IAF, pending submission of final reporting.

Funding Acknowledgement

This program is funded by the Government of BC, as such acknowledgement of funding is required when publicly communicating about a project and/or funding. To ensure appropriate acknowledgement, all communications and marketing materials, including public announcements or social media posts, must be pre-approved by the IAF Communications Team. Materials can be submitted via the IAF Client Portal.

Reporting Requirements

Successful applicants must complete a final report and audit (if applicable) prior to receiving final payment from the program and may be required to submit interim activity and financial reporting. All required reports must be filled out and submitted via the IAF Client Portal to be considered for funding reimbursement. It is important reports are submitted on time and with all required information. Please retain all invoices and receipts, you may be asked to submit some or all receipt/invoices following a review of your report(s) by the IAF Team. Expenses will be reimbursed based on audited receipts, financial report, and the approved project budget. All reporting will be completed via the IAF Client Portal.

Prioritization


Considerations for Evaluation

  • Is the applicant aware of the regulatory requirements for the project other than water permits or dam safety authorizations?
    • Not all permits need to be in place prior to obtaining a water permit, but all permits must be in place before beginning construction.
    • Other types of permits or permissions required to install water infrastructure may include, but are not limited to:
      • Permits to cross roads governed by the Ministry of Transportation and Infrastructure (MOTI), the Ministry of Forests (MoF), or municipal governments.
      • Permission to cross utility Right-of-Ways (ROWs).
      • Easements or permission to cross private property.
      • Permission to join a shared waterworks system.
      • BC Hydro permits to run power to pumps.
      • Permits/approvals from the Department of Fisheries and Oceans (DFO).
    • For questions on regulatory requirements, please contact FrontCounter BC.
  • What is the severity of water constraint or risk for the watershed that serves as the main supply source for the project?
  • Is the project located in a region or watershed where it is possible to develop additional or alternate water supply sources?
    • Assessment of this criteria will include a review of water allocation notations. Water allocation notations provide an indication of the potential lack of water availability on a source and are used to inform statutory decisions on water allocations.
    • For more information regarding water allocation notifications and the potential to develop water supply source(s), please refer to the Water Allocation Notations and Registered Water Allocation Notations documents provided by the Ministry of Water, Land and Resource Stewardship.
    • Please contact FrontCounter BC if you have any questions.

FrontCounter BC
Phone: 1-877-855-3222
Email: FrontCounterBC@gov.bc.ca
Video Conferencing
Find a FrontCounter BC Regional Office

Considerations for Evaluation

  • How significantly will the project improve water use efficiency and storage?
  • How significantly does the project benefit agricultural production in the area?
  • Does the project promote the development or use of a sustainable water supply with long, medium, or short-term solutions?

Considerations for Evaluation

  • Does the approach address water issues based on professional standards?
  • Is the project plan provided comprehensive, and does it clearly demonstrate the scientific rationale, merits, impacts of the approach to the project, and mitigation measures?
  • Is the conclusion reasonable and does it make sense?
  • Are the outcomes reasonable based on the approach taken?

Ready to Apply?

Applications are now closed.

Resources


AWP Webinars

Watch the AWP webinars.

Have a Question?

Reach out to the IAF Team – we’re here to help!
Email AWP@iafbc.ca or call 250-940-6150.

AWP S2 Program Guide

Download the AWP Stream 2 Program Guide for your reference.

AWP Funding Ack. Requirements

Learn how to acknowledge the funding on public communication materials.

Have an Active Project?

Please visit the AWP Project Resource Hub for more information on reporting, funding acknowledgement and more.